THERMODYNAMIC GEAR



Site: 
Massa, Italy
Cliente: 
Nuovo Pignone Di Massa
Anno: 
2009
  • Project Management, Safety Coordination during Construction Works: GPA

This intervention consists in the construction of a 80 x 50 metres plant area in order to allocate the technological systems necessary for the new test compressor’s operation. The system denomited, thermodynamic testing bench, located inside the Nuovo Pignone di Massa. The project provides an engine of medium voltage for powering two large-sized compressors. The medium voltage engine is powered by 3 mid-voltadge swtiches type “ansaldo”. The operation system consists of a 33 kv switch board, 3 transformers 33/3 kv, 3 midvoltage switches and 3 external reactors for each converter. The intervention also provides the construction of a two-story control room.